- Spray Booths[8]
- Other Chemicals[1]
- Paint & Coating[2]
- Other Accessories & Parts[3]
- LED Displays[1]
- Water Treatment[1]
- Other Construction Material Making Machinery[1]
- Drying Equipment[1]
- Chemical Product Machinery[1]
- Cleaning Equipment[3]
- Energy Saving Equipment[1]
- Other Food Processing Machinery[1]
- Other Industrial Filtration Equipment[1]
- Other Machine Tools[1]
- Conveyors[2]
- Other Material Handling Equipment[1]
- Metal Coating Machinery[10]
- Other Metal Processing Machinery[2]
- Other Machinery[10]
- Printing Machinery[1]
- Other Metals & Metal Products[3]
- Drums[1]
- Safes[10]
- Other Tools[1]
- Spray Gun[8]
- Contact Person : Mr. chen xianzhong
- Company Name : Zhejiang Huier Coating Environmental Protection Equipment Co., Ltd.
- Tel : 86-572-8885683
- Fax : 86-572-8885383
- Address : Zhejiang,Deqing Town,1098 Zhiyuan South Road Wukang Country
- Country/Region : China
- Zip : 313200
Related Product Searches:shot blasting chamber,High Quality,shot blasting chamber, wet chamber,HUIER
When it works, dust collector, separator, elevator and screw delivery device are started, then start the blasting wheel, so the preparation is ready to work. First, load workpieces on feeding roller, wokieces will go into blasting room by roller’s convey. There is test device in front of inlet of blasting chamber, when the head of workpiece goes though, after calculation of PLC and finish delaying time, shot gate will open automatically, and begin to clean the workpieces. The workpieces will go ahead, meantime, they are cleaned by steel shot to remove the oxide skin, rust and sewage, until they leave the blasting room. When steel plate and profile steel passes back assistant room, it takes brush sweep and high pressure wind blowing method to blow the accumulated shots and dust on workpieces’ surface. Steel pipe workpiece doesn’t need blow and sweep. When workpiece goes into discharge roller, the whole cleaning process is finished. When tail of workpieces go though testing, after calculation of PLC and finish delaying time, shot gate will close automatically. After the workpieces leave the blasting room completely, then unload workpieces on discharging roller. Repeat this process until the work is finished, then stop machine step by step.
Working process
start the dust collectorstart the separatorstart elevatorstart transversal screwstart longitudinal screwstart conveyor systemstart blow sweep systemstart blasting wheelload workpieces on feeding roller10. workpieces go ahead and stop at the fixed position, then start shot gate
11. project steel shot, cleaning is beginning
12. after the workpieces finish cleaning, close the shot gate
13. unload workpieces on discharging roller
14. repeat steps of 9,10,11,12.13 steps
15. please turn to step 16 if you want to stop working
16. stop blasting wheel- stop blow-sweep system-stop longitudinal screw-stop transversal screw-stop elevator-stop separator-stop dusct collector-stop roller, whole machine stops working.